Sunday, October 18, 2009

Remodeling the 1st Floor of our House

We found an old sink and cabinets on Craiglist - found the door at a recyled materials store.  Catherine tiled the floor and this wall here.  I ran the wiring to the switches and put in recessed lighting, and our friend Paul did the plumbing.
  
This is what the old floor looks like, after we stripped off the paint, sanded it and here's a couple coats of polyurethane.   We believe it was used as the floor of a machine shop.

After we demolished the old kitchen, which wasn't much to speak of, other than a cool stove - The room looked like this.  

I believe Jeffrey Dahmer summered here.


Anyway, now the room is really...  poised to come together.  We started in July, and it's now October.  I don't think we'll be done before December.  



Why does it take so long?  One is that we wanted to put a radiant heated floor in our kitchen - and that was a lot of work. we cut the room in half, cut out part of the floor and placed radiant heating tubes and poured concrete.  We managed to run tubes under part of the wood floor as well.  That was quite hellish, crawling under the floorboards.  



Saturday, July 25, 2009

Another Radiant Floor Heating System


The Irishmen, again with the concrete.  

Summer BBQ #2

July 11th BBQ with family and friends.  What is she finding in that sand?  Not sure I want to know.

When you're in the middle of tearing apart your kitchen is the perfect time for a party.

While we're working on the kitchen, we have basically moved our life into this chaotic scene here in the warehouse.   




Sunday, July 12, 2009

Blasted Wood

A marked improvement.  Here's a photo from about 6 months ago:




There had been pigeons in the building, I blasted a lot of pigeon shit off the cupola.  When this picture was taken you couldn't stand up anywhere near there, and we were just walking around sandblasting standing on the 2 floors we have since put in - one at 10 feet, and one at about 25, that one just under the cupola.  That's a pretty marked difference.  I guess things happen everyday, but then again, so does breakfast - and sometimes the progress doesn't feel huge day to day.  Sometimes it does.  Recently there have been some major leaps and bounds.   It feels nice.  It feels like we have got this giant peach moving forward.  

Monday, July 6, 2009

Sandblasting

We rented a sandblaster for a week. It was an extremely dirty job.  We cleaned up a lot of the old brick and wood beams in the building.

I will post pics of a cleaner building soon.  As soon as I get the sand out of my nose.


Thursday, June 18, 2009

The Cupola and Loft


How to explain this cabin on the top of the building?


Replacing Old Rotting Wood on a Roof -- pass the Steve Miller

With these stairs, we can now get to the Cupola from the Loft.

Have you ever seen the Loft?  It's sort of the unsung Treasure of this place... or shall be eventually... I think it's kind of cool already.  Dirty as all hell and in need of... everything.

Wednesday, May 6, 2009

Radiant Heat in a Concrete Floor

We hired an Irishman named Kevin to take up the old messed up slab with his excavator, put down stone, and pack the floor.  When deciding who to hire, there were a couple of guys named Kevin who were in the running and part of my conversation with Catherine included the following:
Cat: "Why do you want to hire this new Kevin over that other Kevin?" Me: "This Kevin is not a crackhead."  The other Kevin had reputedly cut off his wife's arm in a drug-induced skirmish involving a samurai sword. That story came from the same guy who had recommended him. He also smelled.  The choice wasn't hard.  The Kevin we did hire ended up being superb.  He came over with another Irishman named Cormack and it was grand.

Patrick McDonald, a local architect and developer - a friend of a friend, was in between projects, and helped us out by designing a radiant heat system to lay in the concrete.  These are his guys putting in Pex tubing.  Warm water will flow through these tubes and heat up the concrete floor.  It's like walking on a giant radiator.  It's also quiet heat which is perfect for a recording studio.

We marked where the walls will go in the studio and put in these foam pieces so that when we pour the concrete, there will be separations between the rooms - which is ideal for killing sound vibrations from one room to another.  Start at the bottom - all rooms on independent slabs. This was fun.  Our architectural drawings were somehow a few feet off and it was messing things up, so we sort of scrapped it and spray painted the lines for the walls at night before the concrete went in.  That felt liberating and I think we ended up with a great design that responds well to the space. A little spray foam to close all possible gaps because I got a bit obsessed with the separate slab thing.

Irish Kevin and his Home Depot Day Laborers -- is that a good name for a band?
And after a little polish and setting... We have a nice new concrete floor.

You're supposed to keep it wet for 30 days
A whole mess of radiant pex tubes coming out in a future closet to deal with later.  Pressure gage is good, meaning we didn't poke a hole in any of the tubes.  So it's good to go.  That wasn't too bad at all... It's the boiler that's the expensive part...  It's almost summer now, and we might wait until we absolutely need it next winter.




Sunday, May 3, 2009

Spring 09 Barbeque


We had a small barbeque with a few friends during a little April heat wave.  It was a llittle taste of summer.


Ping pong on a packed dirt floor

Sunday, April 26, 2009

Tree Planting


On Saturday we worked with a bunch of volunteers planting trees in the neighborhood.  We planted 70 trees and quite a lot on 5th Street.


We put a "Serviceberry" tree in front of our place on 5th Street.  I was just looking for a photo of the day we put a tree in on Randolph Street, and found it on my phone.


Friday, April 24, 2009

Contruction Continues



Yeah!  Hi Fives all around!  Floor in the studio is nearly ready to be poured!


This was quite a dusty day... We had to hire an excavator to come and break up the old screwed up concrete in the space that will eventually be the studio. Behind him, starting the wall between the studio and the kitchen / offices.



Oops!  Took out too big a chunk of concrete.  We now have a hole in our bathroom floor.